Superior’s South Pool $6M Renovation Project: Upgrades and Amenities Revealed
Life in Boulder Valley
Archives
Superior’s South Pool $6M Renovation Project: Upgrades and Amenities Revealed
SIGN UP FOR OUR NEWSLETTER
Residents in Superior, Colorado, are buzzing about the upcoming changes to their beloved South Pool. |
Residents in Superior, Colorado, are buzzing about the upcoming changes to their beloved South Pool.
The town is gearing up for a transformative renovation project that could top $6.23 million.
This ambitious plan follows recent guidance from the Superior Town Council, aiming to revamp the facility at 3300 Huron Peak Avenue.
Imagine families splashing around in a brand-new setup, complete with thrilling additions like a water slide and interactive splash pad.
Local leaders have opted for a full demolition of the existing structure, paving the way for expanded amenities that reflect community wishes.
Think lazy river channels or relaxing in-pool hot tubs, all designed to elevate summer fun.
Meanwhile, the nearby North Pool at 1650 South Indiana Street is also on track for its own multi-million-dollar facelift, with upgrades potentially reaching $4.5 million.
Both projects stem from resident input gathered through open houses and feedback sessions earlier this year.
Mayor Mark Lacis emphasized prioritizing quality over costs, ensuring the results delight the community.
Construction might kick off in late 2026, with refreshed pools ready by the 2027 season.
These enhancements could even extend swimming seasons, giving locals more time to enjoy the water.
As Superior continues to grow, such investments highlight the town's commitment to vibrant public spaces.
With new businesses and developments popping up nearby, the revamped pools promise to become central hubs for family gatherings and community events. |

